Loading...

pdf Gfa 011an Popular

By Tagged in L-13, L-13A 812 downloads

Gfa 011an

L-13 BLANIK 

During a recent inspection of an L-13 Blanik a fracture in the carrier for the front rudder pedal was detected. The subject aircraft had amassed 1210 hours operations and 157 hours sine the last major inspection. The rudder pedal carrier bracket has a tubular centre member which has an elongated transverse hole through which the pedal adjustment screw passes. Cracking occurred through the remaining metal on one side of the tube hole.