pdf Gfa 011an Popular
By Tim Shirley Tagged in L-13, L-13A 812 downloads
gfa_011an.pdf
L-13 BLANIK
During a recent inspection of an L-13 Blanik a fracture in the carrier for the front rudder pedal was detected. The subject aircraft had amassed 1210 hours operations and 157 hours sine the last major inspection. The rudder pedal carrier bracket has a tubular centre member which has an elongated transverse hole through which the pedal adjustment screw passes. Cracking occurred through the remaining metal on one side of the tube hole.