Loading...

pdf Gfa ad 012 Cancelled 2017-09-01 Popular

By Tagged in 201, 201B, 401Kestrel, H301B 1016 downloads

Download (pdf, 460 KB)

gfa ad 12 Cancelled 01.09.2017.pdf

Gfa ad 012 Cancelled 2017-09-01

INSPECTION OF RUDDER CABLES

CANCELLED 1/09/2017 

Applicable to the Libelle 201/201B, 301/301B and 401 Kestrel. GFA AD/12 Issue 1 was distributed in 1971. The 13 year space has shown that the need for mandatory replacement of rudder cables at 500 hours intervals is no longer valid. Inspect rudder cables for wear and broken strands particularly at the 'S' tubes at the rudder pedals. at 100 hour intervals and at annual form 2 inspections. Broken strands require cable replacement.