OD 02/2025 Extension of maximum period for flight reviews - Updated
pdf OD 02/2025 Extension of maximum period for flight reviews - Updated Popular
By Executive Manager, Operations 1019 downloads
OD-02-2025-Extension of maximum period for flight reviews - Extended.pdf
Note: This OD replaces the previous OD 03/2024
The release of ANAC AD RA No. 2024-05-01 for the Piper Pawnee tow planes has caused major downtime for gliding operations around Australia. The requirement for the maximum period between flight reviews is currently two years. The Gliding Australia Operations Panel has reviewed this period and extended it to two years and six months. This will allow members and clubs to arrange flight reviews and schedule around tow plane downtime.
Updated: Changes to the ANAC AD now require Eddy Current testing. Tug availability has been reduced once again. This requires a further extension in Flight Review period.