OD 03/24 Flight Reviews – extension of maximum period between reviews
pdf OD 03/24 Flight Reviews – extension of maximum period between reviews Popular
By Executive Manager, Operations 225 downloads
20241002-OD-03-2024-Extension of maximum period for flight reviews.pdf
The release of ANAC AD RA No. 2024-05-01 for the Piper Pawnee tow planes has caused major downtime for gliding operations around Australia. The requirement for the maximum period between flight reviews is currently two years. The Gliding Australia Operations Panel has reviewed this period and extended it to two years and three months. This will allow members and clubs to arrange flight reviews and schedule around tow plane downtime.